DPD BeLux has opened its new 10,000m2 hub in Vilvoorde, Belgium.
‘)
}
// –>
The company has invested €52m (US$50m) in the hub and expects it to be able to process up to 20,000 parcels per hour. A 4,500m2 warehouse has been built on the floor above the hub, which can handle up to 6,000 parcels per hour. This means that DPD BeLux also has a multi-story distribution building with direct connections between the loading and unloading areas. DPD’s chilled and frozen fresh food department also has a separate loading and unloading infrastructure with direct access to the chilling and freezing rooms. The headquarters of DPD BeLux and the DPD fresh depot are also located on the new site.
‘)
}
// –>